Engineering Intelligence for Jira Cloud

Know what's broken.
Predict what's about to break.

Jira ASYNC-447 blocked 14h
GitHub PR #847 waiting on 3 approvals
Slack "builds are failing again"
Zoom Sprint retro — 45 min
Jira Velocity ↓ 12% this sprint
GitHub 6 PRs open > 48h
Confluence Runbook outdated 90d
AI-Powered Strategic Analyst
Proactive Alert
Sprint 12 is at risk. Velocity is at 71% by day 6, and PR #847 is blocking 2 sprint goals. 3 recovery paths identified.
5 sources correlated 92% confidence
Reactive What's broken right now
Proactive What's about to break
Preventive Stay on sprint goals
Install Free on Marketplace See How It Works

Built on Atlassian Forge with enterprise-grade security and zero infrastructure to manage

Jira GitHub Slack Zoom Confluence

The Problem

Your tools have the answers.
They just can't talk to each other.

Sprint velocity is in Jira. Pull request bottlenecks live in GitHub. Blockers surface in Slack threads nobody reads. ASYNC connects every signal into one intelligence layer so you see what matters before it's too late.

2–3 hrs
saved per engineer per day
< 1 hr
blocker discovery (was 12–16 hrs)
5 sources
correlated with AI
Focus Score card showing sprint completion gauge, work breakdown by status, and story point distribution Velocity Trend card showing burn rate, projected completion, and historical sprint comparison Code Pipeline card showing PR flow stages, review bottlenecks, and merge readiness

Sprint Intelligence

Your sprint's vital signs. At a glance.

Three cards that tell you everything about how your sprint is really going, updated in real time from your team's actual work across Jira, GitHub, and Slack.

Are we on track?

One gauge that answers the question every team asks mid-sprint. It compares work completed against time elapsed and breaks it down by To Do, In Progress, and Done.

  • Visual breakdown of your sprint by status, so you can see what's moving and what's stuck
  • Story point distribution across team members to understand who's carrying the load
  • Highlights the biggest items still in the backlog so nothing gets forgotten

Is the team keeping pace?

See how fast your team is actually delivering compared to what was planned. No guessing, no waiting for retro. The answer is right here, right now.

  • Side-by-side comparison of this sprint versus previous sprints so you can spot trends
  • Per-person progress tracking to know who's ahead and who might need help
  • Projected completion date based on real burn rate, not assumptions

Where is code getting stuck?

Watch every pull request move through its lifecycle, from first draft to final merge. Stop wondering what's blocking the release and start seeing it clearly.

  • Visual pipeline of PRs at every stage: draft, in review, approved, and merged
  • Highlights reviews that are piling up or waiting too long for attention
  • Shows which PRs are ready to merge right now so you never miss an easy win

Insights Engine

Everything that happened.
Everything that needs you.

Open Jira and instantly know what happened while you were away. Every update, every mention, every decision. All in one place, sorted by what needs you first.

Your Items & Team Activity

Every review request, ticket update, Slack mention, and doc edit from the last 24 hours, all organized by where it came from and how urgent it is. Your items show up first, then your team's activity. Nothing gets lost.

Action Queue & Decisions

Your to-do list, prioritized by AI. What needs attention right now, what can wait until today or this week, and what's strategic. Every action links back to the original ticket or conversation. Plus, your team's recent decisions are highlighted so you're never out of the loop.

Your Items and Team Activity panel showing PRs, Jira updates, Slack mentions grouped by integration
Action Queue with AI-prioritized items bucketed by urgency — Immediate, Today, This Week

AI-Powered Standups

Your standup, written for you.

ASYNC reads your commits, pull requests, Jira tickets, and Slack mentions, then writes your complete Yesterday / Today / Blockers summary for you. Zero prep time. Perfectly accurate. Ready before your morning coffee.

Engineers save 25–50 minutes per week. Multiply that across your team.

Start Free
Today's Standup auto-generated • 9:01 AM
Yesterday
Merged PR #142 — user auth token refresh
Reviewed 3 PRs for the billing module
Today
Continue API rate-limiting implementation
Sprint review prep with design team
Blockers
Waiting on staging deploy — CI pipeline queued

Intelligence Cards Coming Soon

Problems surfaced before they become incidents.

Intelligence built in, always watching. Review pile-ups, slowdowns, context switching, build problems, scope changes, all caught as they happen, not after. You get alerts for what needs attention now and early warnings before things break.

  • Review Bottleneck Alert: pull requests blocking your sprint goals
  • Velocity Risk Warning: your team is moving slower than needed
  • Context Switching Tax: too many things in progress at once
  • Build Health Alert: broken builds and unreliable tests
  • Sprint Scope Stability: unplanned work sneaking into the sprint
⚠ Velocity Risk Warning Soon
Team is at 41% completion with 60% of sprint elapsed. Projected to miss commitment by 3 stories.
◉ Review Bottleneck Soon
5 PRs waiting over 24 hours. 2 assigned to the same reviewer. Sprint goal at risk.
↻ Context Switching Tax Soon
3 engineers working across 4+ tickets each. Focus time below recommended threshold.

ASYNC Copilot

Ask anything about your engineering data.

"Why is velocity down?" "What's blocking Sprint 5?" "Can we ship Friday?" ASYNC Copilot is a conversational AI that queries across all your connected tools and answers in plain language, backed by evidence, not opinions.

Generates retrospectives, standup summaries, blocker analysis, and project health reports on demand.

Available in Advanced
“Can we ship Friday?”
Based on 3 open blockers, 78% sprint completion, and 2 failing build pipelines, I recommend a Tuesday release with conditions.

Intelligence for Every Role

One platform. Built for every role on your team.

From developers to the executive team, ASYNC delivers the right insight to the right person at the right time.

Engineers

See what needs your review, where the risks are, when you have focus time, and how fast work is moving. Know your day before it starts.

QA & Test Engineers

Spot unreliable tests, get coverage alerts, and see which changes carry the most risk. Stop shipping on hope.

Tech Leads & Architects

Find review bottlenecks, track how often core systems change, and get alerts when dependencies shift. Protect what matters most.

Product Managers

Track sprint commitment, catch scope changes early, and follow customer-impacting bugs. Walk into every standup with the full picture.

Engineering Managers

Monitor delivery consistency, balance review workloads, spot cross-team dependencies, and catch early signs of burnout. Lead with clarity.

CTOs & VPs Engineering

See the big picture across 9 risk areas. Answer board-level questions with real data. Spot problems 7 to 90 days before they hit.

Dual-Dashboard Architecture

Two lenses. One truth.

Engineering Pulse for your entire team. Strategic Pulse for leadership. Same data, different depth, with privacy-safe access controls built in.

Engineering Pulse
Sprint health, delivery pace, blockers, review queues, and intelligence cards. Built for the whole team.
Strategic Pulse
Burnout signals, knowledge concentration, technical health, and team retention risk. Built for leadership.

Pricing

Free for small teams. Scales with you.

Teams of 10 or fewer get full access at no cost. Larger teams pay a simple per-user rate with volume discounts, all billed through the Atlassian Marketplace.

Small Teams

Free

Up to 10 users with every feature included

  • Jira + GitHub + Slack + Zoom + Confluence
  • Engineering Pulse dashboard
  • Sprint insights and focus scoring
  • Cross-timezone handoffs and AI briefings
  • Insights engine with blocker detection
  • AI-generated standup summaries
  • Rovo AI Copilot
Install Now

Enterprise

$2.00 / user / month

251+ users with volume discounts up to 85% off

  • All features included, plus:
  • Volume pricing from $2.00 to $0.38/user
  • Multi-instance support
  • Predictive intelligence (7 to 90 days ahead)
  • Cross-team strategic insights
  • Priority support
  • Dedicated onboarding
Start Free Trial

Stop reacting.
Start seeing what's next.

Join engineering teams who traded guesswork for clarity. Install ASYNC in under 2 minutes.

Get ASYNC Free